SIM04 · 起源 / 从物料与信息流图到时间梯SIM04 · Origin / From material-and-information flow to the time ladder

一件产品从投料到交付,到底有多少时间在加工?From release to delivery, how much time is this part actually being worked on?

丰田先用“物料与信息流图”把整条价值流画在一张纸上。 年,Mike Rother 与 John Shook 在《Learning to See》中把这套方法带给更多制造企业。下面跟住一件红色工件:四道工序各加工 6 秒,绿色是增值,红色是排队。 Toyota first mapped the full value stream with material-and-information flow diagrams. In , Mike Rother and John Shook brought the method to a wider manufacturing audience through Learning to See. Follow the red part below: each of four operations adds six seconds of processing. Green is value-added work; red is queue time.

🎬 跟住红色工件,看 24 秒加工藏在多少等待里🎬 Follow the red part and see how much waiting surrounds 24 seconds of work
4 工位 · C/T 均为 6 秒 · 红色跟踪件 · 14× 播放4 stations · 6-sec C/T each · red tracked part · 14× playback
0.0s
0.0s
0.0%
时间梯 · 绿=加工增值 / 红=排队等待Time ladder · green=processing / red=queueing0.0s

💡 跑完看数据:在制品越多,增值比越低💡 Run it, then read the numbers: more WIP lowers the value-added percentage

三档均跟踪同一件产品走完四站Each mode follows one part through all four stations
初始在制品Initial WIP / position增值时间Value-added总周期Total lead time增值比Value-added %
每处 2 件2 at each position
每处 8 件8 at each position
每处 16 件16 at each position

增值比 = 增值时间 ÷ 总周期。三档都没有加快任何机器,四站增值时间始终是 24 秒;改变的只有红色排队段。Value-added percentage = value-added time ÷ total lead time. No machine runs faster in any mode, so value-added time stays at 24 seconds. Only the red queueing segments change.

🎯 改善顺序🎯 Improvement priority
先砍排队等待,再考虑把机器做得更快。Cut queue time first. Speed up the machine only after that.

⚠ 常见误区⚠ Common mistakes

✗ 提效率 = 让机器更快✗ Better efficiency means faster machines
✓ 先砍等待,增值时间通常动都不用动。✓ Cut waiting first; the processing time often needs no change.
✗ 库存是资产✗ Inventory is an asset
✓ 在制品冻结的是生产周期。✓ WIP locks lead time into the process.
✗ VSM 画完就挂墙上✗ Finish the VSM and hang it on the wall
✓ 画图是为了定下一步先砍哪段等待。✓ The map should identify which waiting segment to remove next.